This is a sample report generated from synthetic data to demonstrate Aldwych’s output. The property, figures, and photos are illustrative — this is not a real client report.

Sample Commercial Property

Sample Commercial Property

Draft for review. Aldwych adds guardrails, but this is a first draft written from your photos, notes, and answers — review it for accuracy before delivering it to your client, then Save.

Verified source Estimate / standard — verify Must review

Property Description

Site

The site is improved with a bituminous asphalt parking area, concrete curbing, and landscaped perimeter islands.The asphalt surface exhibits scattered transverse cracking and minor raveling but remains serviceable; localized crack sealing and a seal coat are recommended within the near term.

Building Envelope

The building is of steel-frame construction with a painted concrete masonry unit and storefront-glazing exterior.Exterior wall surfaces and sealant joints were observed to be in fair condition, with isolated areas of faded paint and weathered perimeter caulking.

Opinion of Probable Costs

Evaluation Period: 10 Years · Aldwych’s estimates shown; enter your own values to override (your value wins). The narrative references these costs in words only.

3 of 6 priced lines are lump-sum estimates with no measured quantity behind them (tagged No quantity basis below) — worth verifying against a takeoff or quote.

Immediate repairs

subtotal $4,000

electricalNo quantity basis

Complete panel schedule and label branch circuits

EST: allowance for a licensed electrician

Aldwych estimate

$1,200

line total$1,200
site_civilNo quantity basis

Refresh faded pavement striping and accessible-stall markings

EST: lump-sum re-striping allowance

Aldwych estimate

$2,800

line total$2,800

Short-term repairs (1–2 years)

subtotal $216,000

roofing

Built-up roof membrane replacement (low-slope, ballasted)

EST: $9/SF installed over 24,000 SF roof area

Aldwych estimate

$216,000

24000 SF × $9/SF

line total$216,000

Replacement reserve (10-year evaluation period)

subtotal $110,500

hvac

Packaged rooftop units — replacement at end of life

STD: 15-year EUL for packaged RTUs

Aldwych estimate

$56,000

4 EA × $14,000/EA

Standard referenceEUL 20 yr · RUL 8 yr
Year 3
line total$56,000
site_civil

Parking-lot resurfacing and seal coat

EST: $2.50/SF over 18,000 SF of asphalt

Aldwych estimate

$45,000

18000 SF × $3/SF

Standard referenceEUL 25 yr · RUL 11 yr
Year 6
line total$45,000
plumbingNo quantity basis

Commercial water heater replacement

EST: lump-sum equipment and installation

Aldwych estimate

$9,500

Standard referenceEUL 15 yr · RUL 7 yr
Year 4
line total$9,500
Total identified costs$330,500